Yolo County Landfill Gas Processing Facility

Project Overview

Client

Mead & Hunt

Location

Yolo County, California

Project Timeline

August 2026

Agency

Yolo County

Reliable Project Control

Reliable Project Control

Lease Area Layout

Lease Area Layout

Detailed Terrain Mapping

Detailed Terrain Mapping

Engineering Design Support

Engineering Design Support

Yolo County Landfill Gas Processing Facility

Cardinal Land Surveying was retained by Mead & Hunt to provide survey support for a proposed gas processing facility at the Yolo County Central Landfill outside Woodland, California. The design team needed reliable project control, defined lease limits, and detailed existing conditions mapping to plan the equipment pad, grading, and associated pipeline improvements around existing site infrastructure. 


Cardinal established horizontal and vertical project control tied to National Geodetic Survey monuments and surveyed the approximately 2.1-acre lease area using the supplied legal description. GNSS and conventional field surveying documented ground elevations, equipment pads, roads, drainage features, visible utility appurtenances, and utility markings within the survey limits. 


The completed topographic survey depicted the lease area and existing improvements. One-foot contours, digital terrain data, and survey control information provided the engineering team with a consistent base for facility layout, grading design, and coordination of proposed improvements. 

Services Performed:

  • Project Control 
  • Lease Area Survey and Staking 
  • Topographic Survey 
  • Visible Utility and Site Feature Mapping 
  • Digital Terrain Model and One-Foot Contours 
  • Civil 3D Base Mapping