Pickel Meadow Restoration Project

Project Overview

Client

Hanford ARC

Location

Mono County, California

Project Timeline

July 2026 - November 2026

Agency

American Rivers

Reliable Project Control

Reliable Project Control

Aerial Topographic Mapping

Aerial Topographic Mapping

Earthwork Volume Verification

Earthwork Volume Verification

Documented Results

Documented Results

Pickel Meadow Restoration Project

Cardinal Land Surveying was retained by Hanford ARC to provide survey support for the Pickel Meadow Restoration Project near Bridgeport in Mono County, California. Reliable project control and terrain data were essential to documenting existing conditions and verifying excavation quantities. Differences between anticipated and measured quantities required additional evaluation during construction. 


Working with Great Basin Geomatics, Cardinal verified project control and coordinated pre-construction aerial topographic surveying, progress surveys, and a post-construction as-built survey. Cardinal provided ground survey support and evaluated the supplied original-ground model against surveyed pre-construction conditions. Great Basin Geomatics performed aerial mapping, digital terrain modeling, and earthwork volume calculations. 


Comparison of the surveyed pre-construction and final ground surfaces documented 45,069 cubic yards of excavation within an approximately 6.64-acre calculation boundary. Cardinal prepared a signed and stamped report documenting survey methods, control verification, surface differences, and final quantities to support construction verification and project closeout.

Services Performed:

  • Project Control Verification 
  • Ground Control for Aerial Mapping 
  • Pre-Construction and As-Built Survey Coordination 
  • Digital Terrain Model Evaluation 
  • Earthwork Volume Verification 
  • Signed and Stamped Survey Report